See if your factory qualifies — and how much value you may be leaving on the roof.
Takes 2 minutes. No commitment required.
Tell us about your factory so we can model your solar potential.
Based on ATAP-specific optimisation logic.
Score reflects ATAP-specific optimisation logic. Full methodology in Intelligence Dossier.
Drag the slider to explore how system size affects value.
See how Singlebuyer Market Price affects your returns.
Key Insight
Primary ROI driver is tariff displacement (self-consumption at RM 0.334/kWh), not export credit.
Cumulative net value over the system lifetime.
Estimate excludes carbon credit potential and future tariff escalation. Includes 0.5% annual degradation and maintenance reserve.
Your facility demonstrates strong ATAP alignment. Proceed with detailed intelligence to validate feasibility.
Assessment fee fully deductible upon project award.
Average dossier turnaround: 48 hours.
Solar ATAP allocation is subject to capacity window. Quota availability may vary by zone.
Nature of Outputs: The Solar ATAP Exposure Simulator generates indicative modelling outputs based on user-provided inputs and prevailing market assumptions, including retail tariff estimates and System Marginal Price (SMP) averages sourced from publicly available data.
Outputs Are Not Advice: Simulation results are hypothetical projections only. They do not constitute financial, investment, legal, or engineering advice. They are not binding proposals or performance guarantees. They should not be used as the sole basis for capital expenditure decisions.
Factors Affecting Actual Performance: Actual performance may vary materially due to load profile variations, regulatory or tariff amendments by Suruhanjaya Tenaga, SMP volatility as published by Single Buyer Malaysia, engineering design constraints, equipment specification differences, and site-specific conditions not captured in user inputs.
User Acknowledgement: By using this Simulator, you acknowledge that outputs are indicative estimates only and that PowerRoof bears no liability for commercial or financial decisions made based on these outputs. A facility-specific Intelligence Dossier incorporating validated data is required for project-grade assessment.
SMP Data Notice: SMP values used are sourced from Single Buyer Malaysia and represent recent published averages. PowerRoof makes no warranty as to real-time accuracy of third-party data.