ATAP eligibility screening, SMP exposure modelling, load-matched sizing, and 25-year indicative financial projection — compiled into facility-specific intelligence dossiers for C&I decision-makers.
PowerRoof is an analytical intelligence platform — not an engineering firm, not a financial advisor, and not a performance guarantor. Three product layers serve different decision stages.
ATAP-era policy analysis, SMP mechanics, financial modelling frameworks, and sector-specific load profile intelligence — structured for C&I executives, not engineers.
Indicative modelling tool for self-consumption ratio, SMP sensitivity, export forfeiture risk, and payback range — based on user-provided inputs and prevailing market assumptions.
Facility-specific pre-engineering analytical assessment: ATAP eligibility, load-matched sizing, SMP exposure envelope, 25-year indicative cashflow, and carbon displacement estimate.
Effective January 2026, Solar ATAP replaces NEM 3.0 with SMP-based export credits and stricter eligibility. Every prospect we deliver is pre-screened against the new framework.
Multi-tenant exclusion, 1MW MD cap, ownership verification, operating hours analysis. We filter before you waste a site visit on an ineligible building.
8-signal weighted model: sector, zone, bill band, roof size, MD sweet spot, operating hours, tenant structure, ownership. Prioritizes highest-close-probability leads.
Optimal kWp sizing at 75–85% of MD to minimize monthly forfeiture. SMP sensitivity analysis. CAPEX range at RM1,800–2,200/kWp. You arrive at the site visit with the numbers already done.
Industrial prospects get outbound. Residential gets inbound. Both flow through one qualified pipeline — ATAP-screened, scored, appointment-ready.
PowerRoof delivers the intelligence layer that sophisticated CFOs expect before committing capital — structured disclaimers, source attribution, and assumption transparency included.
Every projection states its assumptions. SMP values are date-stamped with source attribution. Sensitivity ranges — not point estimates — are the standard output format.
Structured legal framework: Website Disclaimer, Simulation Disclaimer, Dossier Scope Statement, Terms of Use, and PDPA Privacy Policy — each mapped to a specific platform layer.
Voltek Energy pilot in progress — 3 dossier tiers delivered with satellite imagery, SMP volatility modelling, and load-matched sizing. Pre-engineering analysis, not EPC quotation.
Four milestones. Zero retainer. Your money moves only when ours does.
Decision-maker agrees to site visit. Date and time locked with your team.
Energy snapshot delivered before the site visit: optimal kWp sizing, SMP sensitivity, CAPEX estimate, forfeiture risk analysis.
Your team finishes the physical site assessment and submits findings.
Client signs the installation agreement or letter of intent.
Pre-engineering analytical assessment for your facility — ATAP eligibility, load-matched sizing, SMP exposure modelling, and 25-year indicative financial projection.